Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://baohongwuliu.com/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
天天做天天爱夜夜爽| 国产精品久久午夜夜伦鲁鲁| 任我爽精品视频在线播放| 夫前人妻被灌醉侵犯在线| 成人区人妻精品一区二区不卡网站| 亚洲av无码成h在线观看| 狠狠色婷婷久久综合频道毛片 | 中国内射xxxx6981少妇| 男人的天堂免费a级毛片无码| 麻豆av一区二区三区| 无码国产伦一区二区三区视频| 国产亚洲精品aaaa片app| 国产一区二区三区成人欧美日韩在线观看 | 中文成人无码精品久久久不卡| 日韩av影院在线观看| 成人一区二区免费视频| 插我舔内射18免费视频| 蜜桃视频无码区在线观看| 中国老太卖婬hd播放| 国产欧美一区二区精品性色| 中文在线а√天堂官网| 国内精品久久久人妻中文字幕| 亚洲另类自拍丝袜第五页| 久久er99热精品一区二区| 一本久道久久综合狠狠爱| 婷婷午夜天| 中国少妇内射xxxx狠干| 精品国内在视频线2019| 欧美一进一出抽搐大尺度视频| 一个人看的www片免费高清视频 | 国产-第1页-浮力影院| 日韩精品射精管理在线观看| 中文字幕在线亚洲精品| 天天夜碰日日摸日日澡性色av| 亚洲av无码av制服另类专区| 国产小呦泬泬99精品| 日韩精品一区二区三区视频| 18禁无遮挡啪啪无码网站| 天天弄天天模| 奇米影视色777四色在线首页| 尤物视频在线观看|